International Journal of Mathematics and Mathematical Sciences
Volume 2003 (2003), Issue 39, Pages 2475-2486
doi:10.1155/S016117120321019X
Two-machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
Ali Allahverdi1
, Tariq Aldowaisan1
and Yuri N. Sotskov3
1Department of Industrial and Management Systems Engineering, College of Engineering and Petroleum, Kuwait University, P. O. Box 5969, Safat, Kuwait
3Institute of Engineering Cybernetics, 6 Surganova Street, Minsk 220012, Belarus
Abstract
This paper addresses the two-machine flowshop scheduling problem with separate setup times to minimize makespan or total completion time (TCT). Setup times are relaxed to be random variables rather than deterministic as commonly used in the OR literature. Moreover, distribution-free setup times are used where only the lower and upper bounds are given. Global and local dominance relations are developed for the considered flowshops and an illustrative numerical example is given.